Client: BMW MINI – Wollaston

Contract: Main building construction

The project involved the construction of a new main building housing the BMW and MINI showrooms and workshop facilities. The ground was stone piled, and pad foundations were formed to support the new steel frame. Insulated Kingspan roof and wall cladding was then installed to achieve the required U-values. 

New curtain walling and sectional doors enclosed the building envelope. Internally, the two-storey showroom was fitted out with new partition walls, glazed screens, and floor and wall coverings. Staircases and a lift provided access to the upper level, including access for people with disabilities. 

New mechanical and electrical (M&E) systems were installed in the building and controlled through an energy management system to monitor energy use on site. 

Externally, the site levels and layout were reconfigured to provide extensive customer parking, EV charging points and accessible parking bays. The area in front of the showroom was reserved for vehicle display. Two site entrances were provided, one on the BMW side and one on the MINI side. 

New GRP units were installed within the car park and waste storage area alongside the existing unit housing the incoming mains electrical supply. The adjacent unit housed the upgraded electrical supply, while the final unit served the external EV charging points. 

A new five-bay wash bay was constructed with a direct mains water supply separate from the main building. Its electrical supply was fed from the GRP unit in the car park, alongside the National Grid GRP units.