Client: Wokingham Commercial Units
Contract: Conversion
The project involved the demolition of two existing buildings, a reduction in site levels where required, and the construction of two steel-framed, clad buildings. Permanent sheet piling was installed to retain the difference in levels between the site and the adjacent site along the south-western and western boundaries. The remaining embankment to the west and north-west was battered back for stability.
Piled foundations and reinforced beams were constructed at designated locations to support the main steelwork. During the design stage, the project changed to a net-zero carbon site, requiring increased thicknesses of both roof and wall cladding. The interior of the larger building was then divided into two units, each with its own utility supply and drainage system.